top of page

Thermal Imaging (Case 12)

Case Twelve: Radiant Flooring Commissioning.

Building Type: Water treatment facility.

Observation: During functional testing of a radiant floor system, I discovered several loops that were not circulating water.

Type: Functional Performance testing.

Cause: The manifold that distributed the water through the individual loops were not adjusted properly, starving water from several loops.

Image below shows a radiant distribution manifold. Note several loops are not flowing water

Manifold not distributed water evenly.

Who Am I?

I started my HVAC career working for a plumbing and heating contractor in my home town full time and part time during college. Later, working for Trane as a building automation technician, I learned the value of life time client relationships.  I feel it is important to incorporate a team environment in every project. This includes the contractors, designers, and owners working towards a common goal of creating lasting, energy efficient, and comfortable buildings.  I believe that any building can operate more efficiently, and we should push them as far as possible.  With my experience in building automation, contracting, thermal imaging, and commissioning, I am here to do that.

Other Posts
Follow Me
  • Facebook Basic Black
  • Twitter Basic Black
  • YouTube Basic Black
bottom of page